Projects

EPCIC CONSTRUCTION OF PIPELINES FOR ANOH GAS PLANT PROJECT – Phase I

Client

Duration

Status

Commissioned

The Assa North – Ohaji South (ANOH) project is a Greenfield Nigerian gas development aimed at supporting the domestic market and production initially targeting for Q2 2020. Assa North field is in block OML 21 and is operated by Shell Petroleum Development Company.

The field extends into block OML 53, where it is called Ohaji South and is operated by SEPLAT Petroleum Company. In combination, the unitized field is called ANOH. ANOH is located in Imo State, close to Owerri and about 70 km northwest of Port Harcourt. ANOH will be developed by a Joint Venture (JV) consisting of the Nigerian Government holding 57.5%, SEPLAT holding 20%, Shell holding 15%, TOTAL holding 5%, and AGIP holding 2.5%. The JV will be operated by Shell Petroleum Development Company (SPDC).

The midstream will be operated and developed by ANOH Gas Processing Company Ltd. (AGPC).

The Midstream facility will be developed and delivered into the market in two phases:

Phase 1: 300mmscfd subject to offtake agreements being in place.

Phase 2: 300mmscfd Future subject to offtake agreements and feedstock gas being in place from ANOH/Unit, OML 53 and other adjoining fields.

The plant will be designed for 600 mmscfd on plot suitable for 900 mmscfd.

The overall purpose of the ANOH Gas facilities is to receive wet gas from the ANOH field, deliver processed gas into the OB3 pipeline and evacuate the resulting condensate to the export terminals in Brass, Bonny or for local refining.

The MJD Scope are not limited to the following:

  • Engineering verification · Procurement of Balance fittings, CP materials, and Fibre Optic Cable
  • Pipe Haulage (Onne Port – Assa Project site)
  • Pipe Stringing · Lay & Weld 24” x 3.5km and 12” x 4.7km
  • Trenching & lowering in of pipelines
  • Installation & pre-commissioning of Temporary & Permanent CPS
  • Installation & pre-commissioning of Fibre Optics Cables
  • Pipeline pre-commissioning
  • Intelligent Pigging and Nitrogen Purging

Key Features:

Project Images

Please get in touch for feedback and enquiries

Corporate Office

Eguma Spanner Estate, By Road 1,
Off Boskel Road,
Km 16, Aba - Port Harcourt Expressway,
Port Harcourt, Rivers State, Nigeria.

Fabrication Yard

No. 2, Davies Ikanya Drive,
Off Boskel Road,
Km 17, Aba - Port Harcourt Expressway,
Port Harcourt, Rivers State, Nigeria.

Career / Talent Pool

Join our talent community to explore the latest opportunities at MJD and discover how we empower our people to excel in a dynamic, delivery-driven environment.