Corrosion Control & Monitoring
Long Range Ultrasonic Testing, 24″ Trans Ramos Pipeline
Long range ultrasonic testing across three test locations on the 24″ Trans Ramos pipeline to screen for wall loss without full excavation.
- Diameter
- 24″
- Terrain
- Onshore · Swamp
- Product
- Crude
- State
- Bayelsa
The challenge
The brief for this scope has not been written up yet. The executed scope is recorded below, and the full account is available on request for tender evaluation.
Solution
What we did
- lrut
Long range ultrasonic testing across three test locations on the 24″ Trans Ramos pipeline to screen for wall loss without full excavation.
Result
Outcomes
Man-hours, lost-time injuries and the measured outcome are held in MJD’s project files and issued with the dated period that produced them. They are available on request for tender evaluation.
Record
- Service line
- Corrosion Control & Monitoring
- Asset type
- trunkline
- Nominal diameter
- 24″
- Product
- Crude
- Terrain
- Onshore · Swamp
- Location
- Bayelsa
- Client
- A major Nigerian onshore operator
Scope
Long range ultrasonic testing across three test locations on the 24″ Trans Ramos pipeline to screen for wall loss without full excavation.
Tools deployed
- LRUT
Record incomplete
Execution dates, man-hours, LTI count and measured outcome are held in MJD’s project files and are not yet published here. They are available on request for tender evaluation.
Source: Brochure pp.17–18
