Pigging Operations, 6″ NorthBank – Forcados
Equipment rig-up and caliper foam pig run on the 6″ NorthBank – Forcados delivery line, executed in swamp terrain.
- Service
- Pipeline Integrity & Maintenance
- Diameter
- 6″
- Terrain
- Swamp
- Product
- Crude
- Location
- Delta
The challenge
The brief for this scope has not been written up yet. The executed scope is recorded alongside, and the full account is available on request for tender evaluation.
What we did
Equipment rig-up and caliper foam pig run on the 6″ NorthBank – Forcados delivery line, executed in swamp terrain.
- foam-pig
- smart-caliper
Outcomes
Man-hours, lost-time injuries and the measured outcome are held in MJD’s project files and issued with the dated period that produced them. They are available on request for tender evaluation.
Need to execute a project like this?
Let’s put you on the fast-track. Our systems are designed to leave your asset in good condition, and leave you satisfied.

